
Sod Installation Guide: How to Achieve a Beautiful Lawn
Installing fresh sod is the fastest way to get a lush, green lawn. At Long Island Sod Company, we provide high-quality sod and expert installation services to ensure long-lasting results. Follow this step-by-step guide to properly install sod for a healthy and vibrant lawn.
Step 1: Prepare Your Soil
Proper soil preparation is crucial for successful sod installation. Here’s how:
- Remove Old Grass & Weeds – Use a sod cutter or rototiller to clear away existing grass, weeds, and debris.
- Test Your Soil – A soil test can help determine pH levels and necessary nutrients.
- Loosen the Soil – Rake the soil and till about 2-3 inches deep to promote root penetration.
- Level & Grade – Smooth out the area to prevent water pooling and ensure even sod placement.
- Apply Starter Fertilizer – Use a fertilizer rich in phosphorus to encourage strong root development.
Step 2: Order Fresh Sod
For the best results, order sod from Long Island Sod Company to ensure fresh, high-quality turf. Plan for delivery on the day of installation to prevent the sod from drying out.
Step 3: Lay the Sod
Once your sod arrives, installation should begin immediately:
- Start Along a Straight Edge – Lay the first row along a driveway, sidewalk, or other straight area.
- Stagger the Seams – Arrange sod in a brick-like pattern to avoid visible lines and gaps.
- Push Edges Together – Make sure each piece is tightly placed against the next without overlapping.
- Use a Roller – Roll the sod after installation to eliminate air pockets and ensure good soil contact.
Step 4: Watering Schedule
Proper watering is key to sod survival:
- First Week – Water 2-3 times per day to keep the sod moist and help roots establish.
- Weeks 2-3 – Reduce watering to once per day, ensuring deep root growth.
- Week 4 and Beyond – Transition to 2-3 times per week, depending on weather conditions.
Step 5: First Mowing & Ongoing Care
- First Mow – Wait about 2-3 weeks before the first mowing. Set the mower height high to avoid cutting too short.
- Fertilization – Apply a balanced fertilizer 4-6 weeks after installation to encourage healthy growth.
- Weed Prevention – Avoid using herbicides for at least 6 weeks after installing new sod.
Why Choose Long Island Sod Company for Your Installation?
- High-Quality Farm-Fresh Sod
- Expert Sod Selection for Long Island’s Climate
- Reliable Sod Delivery & Installation Services
- Guidance for Proper Sod Care & Maintenance